Location: University Avenue, next to Boyd Orr Building
Expected Completion Date: 2019
Size: 16640m2 

The new Learning & Teaching Hub will be an inspirational and diverse learning space that will give all of our students the support they need to succeed.

This flagship development will be a creative environment, combining flexible study and social learning space with multi-styled and technology-enabled teaching. Around the clock access to this building will ensure that it is possible to succeed regardless of background or circumstance.

The Learning & Teaching Hub will contain

3 concrete cores and a steel nest

Connect to the adjacent Boyd Orr Building on three levels

6 floors with 3 Stair Cores & 6 Escalators

The site boundaries have been established with a combination of timber hoarding and heras fencing. There is one main gate for access to site on University Avenue with 24 hour security and a temporary site setup on University Avenue.

The main activity at site will be piling along with some early preparatory work for the foundations.

The visit will consist of

A presentation from Multiplex on the Learning & Teaching Hub project.

Q&A

Visitors Induction & PPE

Site Walk

Address Multiplex Construction Europe Ltd
Multiplex Learning & Teaching Hub Site Office
Adjacent to Boyd Orr Building
University of Glasgow
University Avenue
Glasgow
G12 8QQ
G12 8QQ
Directions

The visit will begin and end in the Queen Margaret Union, directly across the road from the Learning & Teaching Hub Site. Please report here on arrival.

Queen Margaret Union

University Gardens

Glasgow

G12 8QQ

Parking available no
Length of Visit 1 Hour
Maximum Group Size 15
Register by March 17, 2018
Disabled Access no
Child Restrictions yes

Minimum Age of 16

Kieran Ronnie

Contact form

The next Open Doors will take place in 2019.

Register your interest