Morgan Sindall has been chosen to build a cargo facility at Heathrow Airport for British Airways and IAG Cargo.

The new building will be a warehouse handling facility for IAG Cargo’s premium products at Heathrow.  With a gross internal floor space of 10,500m² it will stand adjacent to IAG Cargo’s existing cargo facilities on the airport’s southern perimeter. 

A project team to construct the facility, led by Morgan Sindall, started on site in July 2017.

The new facility will handle IAG Cargo’s ‘Prioritise’ and ‘Constant Climate’ premium products. The former is a service focused on speed, and the latter is designed for the handling of temperature-sensitive freight.

The new facility will have a landside interface for freight arriving by road for processing through to an airside exit for loading as cargo. The facility will include a materials handling system installed by specialist subcontractor, Siemens Postal Parcel & Airport Logistics Ltd. 

Morgan Sindall is currently delivering the groundworks / civils package in preparation for the steelworks to commence.

The work in Feb/March is concentrated on the substantial excavations required for the pad foundations and a series of 3m deep pits which are required for cargo processing; the production of the formwork and reinforcement cages for the concrete to be poured on site; the forming of the ground slab and precast walls for the warehouse and MHS, and other works associated with services in the ground.

The work is all on a brownfield site so the new building and services are being delivered alongside legacy services and differing ground conditions which can all be seen on site.

Address BA New Premia Warehouse
IAG Cargo
Morgan Sindall Construction & Infrastructure Ltd
London Heathrow Airport
Sealand Road
Hounslow
Middlesex
TW6 2JS
Directions

Driving from the east /Terminal 4:  Head south-west on the Southern Perimeter Road towards Swindon Road.  At the roundabout (located by the vehicle access security point for the airfield) take the 2nd exit and stay on the Southern Perimeter Road.  At the blue multi-storey carpark and traffic lights turn right onto Sealand Road.  At the roundabout take the 3rd exit leading to the site entrance.

Driving from the west / Terminal 5 / M25:  Exit the M25 at junction 4 taking the A3113 (Airport Way).  At the roundabout take the 2nd exit onto the Southern Perimeter Road.  Head south-east on the Southern Perimeter Road towards Sealand Road.   At the blue multi-storey carpark and traffic lights left right onto Sealand Road.  At the roundabout take the 3rd exit leading to the site entrance.

Public transport:  There is a free local bus network for those arriving by public transport. Hatton Cross or Terminal 4 serve the site location best where the 555, 490 & 482 (free) busses that will bring them to site – stop 51098.

Parking available yes

Parking is available on site.  Please follow site rules and reverse park only.

Length of Visit 2 Hours
Maximum Group Size 15
Register by March 19, 2018
Disabled Access no
Child Restrictions no

Amanda Soundararaj

Contact form

Book your visit Manage your Bookings

March 21, 2018

10 a.m. - noon 12 Places Left Book

March 22, 2018

10 a.m. - noon 15 Places Left Book