The Lillie Square project stems from continuous work relating to the regeneration of Hammersmith & Fulham and the Royal Borough of Kensington & Chelsea. We are contributing to the redevelopment of the future shopping village and residential properties where the iconic Earls Court arena once stood. 

The project comprises of all necessary design completion, supply and installation of frame works to facilitate the construction of a single storey basement under Phases 2 & 4 and above ground buildings Block C (Phase 2) and Block D and Townhouses (Phase 4).

The Works consist of: 

Pile caps

Basement raft

Waterproofing

Underslab drainage

Underslab services

Concrete frame (walls, columns, beams, upstands etc.)

Suspended slabs

Staircases

Casting in frame and balcony fixings

Following a safety briefing, visitors will be escorted around the site to see what work is currently underway and what outcome Keltbray is working to achieve. There will be an opportunity for a Q&A, as well as a chance to learn about the job roles and opportunities available within the construction industry.

Address Lillie Square
Seagrave Road
Fulham
SW6 1RX
Directions

From West Brompton station walk down Lillie Road and take the first left on to Sea Grave Road. Once on Seagrave Road you will walk past a Sir Robert McAlpine site entrance before arriving at a Keltbray Site entrance on the left.

Parking available no
Length of Visit 1 Hour
Maximum Group Size 15
Register by March 15, 2018
Disabled Access no
Child Restrictions yes

Over 16 years only

Claire Coombs

Contact form

The next Open Doors will take place in 2019.

Register your interest