The Royal Albert Dock Phase 1 is the construction of five plots including all associated public realm, roads and infrastructure, along with the refurbishment of two listed buildings. Phase 1 works will also include construction of a temporary Energy Centre. The Project is found to the east of London in the borough of Newham

The RAD project is the construction of over 430,000m2 commercial plus residential space on the former wharves site located in E16 directly opposite the London City airport the development is based in the borough of Newham

Address Royal Albert Dock
Millman Road
London E16 2TY
E16 2TY
Directions

From Canning Town take the Beckton DLR to beckton Park and walk up to site security cabin.

Parking available no
Length of Visit 1 Hour
Maximum Group Size 10
Register by March 19, 2018
Disabled Access yes

We would need prior notice and could install a portable ramp at the site security office

Child Restrictions yes

We do not allow children on site

Dot Lynas

Contact form

Book your visit Manage your Bookings

March 21, 2018

10 a.m. - 11 a.m. 1 Place Left Book

March 22, 2018

10 a.m. - 11 a.m. Fully Booked

March 23, 2018

10 a.m. - 11 a.m. 4 Places Left Book