The Royal Albert Dock Phase 1 is the construction of five plots including all associated public realm, roads and infrastructure, along with the refurbishment of two listed buildings. Phase 1 works will also include construction of a temporary Energy Centre. The Project is found to the east of London in the borough of Newham
The RAD project is the construction of over 430,000m2 commercial plus residential space on the former wharves site located in E16 directly opposite the London City airport the development is based in the borough of Newham
Address Royal Albert Dock
Millman Road
London E16 2TY
E16 2TY
Directions From Canning Town take the Beckton DLR to beckton Park and walk up to site security cabin.
Parking available no
Length of Visit 10 Minutes
Maximum Group Size 15
Register by 19 Mar 2018
Disabled Access yes
We would need prior notice and could install a portable ramp at the site security office
Child Restrictions yes
We do not allow children on site

Dot Lynas

Contact form

Booking coming soon click here to register your interest or keep checking the website for more information.

Register your interest