Castle Primary School Tiverton

BAM Construct UK Ltd Contact

The new development will be constructed as a two storey block consisting of a steel frame with in-situ ground floor, precast concrete upper floor & stairs. The envelope is a mixture of curtain walling & split faced blockwork supported on SFS. Internally lightweight partitions, suspended ceilings, vinyl & carpet flooring finish the building

Following an initial safety briefing and introduction, visitors will be escorted around the Project

Address Castle Primary School, Barrington Road, Tiverton,
EX166QR
Directions

From the M5 take junction 27 towards Tiverton, following signs to town centre, the site access is via Barrington Road towards the end of the one way system through Tiverton town centre.

Parking available no
Length of Visit 40 Minutes
Maximum Group Size 10
Register by 1 Apr 2017
Disabled Access no
Child Restrictions yes

Children under the age of 5 are not permitted on site, with all older children required to be escorted by an adult.

Beth Kidd

Contact form

Book a Visit Manage your Bookings

31 Mar 2017

2 p.m. - 3 p.m. 3 Places Left Book
3 p.m. - 4 p.m. 10 Places Left Book
4 p.m. - 5 p.m. 2 Places Left Book

1 Apr 2017

9 a.m. - 10 a.m. 2 Places Left Book
10 a.m. - 11 a.m. Fully Booked
11 a.m. - noon 2 Places Left Book