Phase 1 works:

Secure site perimeters with 2.4m high timber hoarding constructed and to remain in place upon completion of the works

Carry out pre-demolition phase R&D Asbestos surveys in accordance with HSG 264 guidance

Remove any Asbestos Containing Materials (ACMs) identified within the R&D survey

Decommission and remove all plant and M&E installations back to the incoming valve, switch or meter on all levels – excepting live UKPN substations

Soft strip non-structural walls and partitions, column casings, wall, floor and ceiling finishes, duct covers, raised floors, fixed and joinery items throughout the buildings, and clear from site

Design and installation of temporary works support / justification to adjoining properties where required

Removal of masonry chimney stacks/breasts and infilling of 2nd floor opening to adjacent to 3 Audley Square party wall

Structural demolition of the existing buildings down to the top of ground floor level slab

Investigation works to the existing Hill Street vaults

Sequential removal of the redundant fuel tanks located in the former Waverton Street filling station compound and installation of compacted fill back up to adjacent ground levels

Phase 2 works:

Establish site welfare and security measures in preparation for the second phase of works.

Relocate hoardings to suit phase 2 and future works

Coordinate site works with utility services diversions/disconnections

Install temporary support works to facilitate the contract works

Reduced digging to levels as required by contract

Install monitoring for movement and environmental measurement

Phase 2 works

Address Audley Square House
Audley Square
Mayfair
London
W1K 1AB
W1K 1A
Directions

Piccadilly Line - The entrance is about 10-15 walk from Hyde Park Underground station - exit the stionion towards the Hilton International Hotel, walk up Park Lane towards Marble Arch, turn right on to Deanery St and then after about 40 metre on to to Tilney St, at the end turn left on to South St, the site is about 30 metres on the right (next to the Nehru Centre) surrounded by blue hoarding.

Central Line - The entrance is about a 15-20 minute walk from Marble Arch Underground station - exit the station towards Park Lane (on the left hand side of Park Lane), towards Hyde Park, turn right on to South st, at the end turn right on to South Audley St, the site is about 100metres on the left (next to the Nehru Centre) surrounded by blue hoarding.

Parking available no
Length of Visit 1 Hour and 20 Minutes
Maximum Group Size 10
Register by March 19, 2018
Disabled Access no
Child Restrictions yes

Visitors under the age of 18 years of age must be acompanied by someone over the age of 18 years of age.

John Rimmer

01923255256

Contact form

Book your visit Manage your Bookings

March 20, 2018

9 a.m. - 10:20 a.m. 9 Places Left Book

March 22, 2018

9 a.m. - 10:20 a.m. 9 Places Left Book

March 23, 2018

1 p.m. - 2:20 p.m. 10 Places Left Book