We are constructing a smart motorway between junctions 2 and 4 of the M6 in both directions. The project totals 22km in total and suffers from congestion and unreliable journey times, carrying approximately 120,000 vehicles per day between Coventry and Birmingham. As part of the upgrade, we will add an extra lane in both directions, introduce new CCTV cameras and electronic information signs and signals on gantries.

-  Installing new drainage and refurbishing existing drainage

-  Removing existing gantries and installing new and refurbished gantries

-  Removing existing environmental barrier and installing improved environmental barrier

-  Installing new technology to help support the upgrade to smart motorway

-  Installing surface water channels, VRS

Address M6 2-4 SMP, Balfour Beatty VINCI junction 4 compound, Coleshill Heath Road, Off A446, Coleshill, Warwickshire
B46 3JB
Download directions to site
Site Entrance
Parking available no
Length of Visit 1 Hour
Maximum Group Size 15
Register by March 18, 2019
Disabled Access yes
Child Restrictions yes
Minimum age 16

Natalie O'Dwyer

Contact form

The next Open Doors will take place from Monday 16 - Saturday 21 March 2020.

Register your interest