The construction of a 190 bedroom four star hotel with associated conference facilities, a 34 and a 30 storey residential towers, with circa 430 apartments, 120,000 ft2 of new retail, including M&S and Boots, a multi storey car park, and extensive public realm works. Linked into the two existing shopping centres, the Peacocks Centre and Wolsey Place. The proposed works also include associated Highways works.

A recent variation to the scope involves the demolition and reconstruction of the Red Car Park along with the remodelling of the Bandstand Mall entrance.

Early works included the demolition of Boots, the Export House frontage, and the access ramps to the existing car park.

General Construction including high rise.

Address McAlpine Construction Office
9th Floor Export House
Cawsey Way
Woking
Surrey
GU21 6QX
Directions

Access to site via site pedestrian route off of High St. Woking and Victoria Way, Woking.

Car parking is available above the adjacent Peacock Centre.

Download directions to site
Parking available yes

Car parking is available above the adjacent Peacock Centre.

Length of Visit 1 Hour
Maximum Group Size 24
Register by March 15, 2019
Disabled Access no

Stepped access

Child Restrictions yes

Year 10 and above 

Minimum age 15

Lisa Butler

Contact form

The next Open Doors will take place from Monday 16 - Saturday 21 March 2020.

Register your interest