About Aspire - Herschel Street

 Anew development in the heart of Slough.

Sitting in the heart of Slough town centre, Aspire is a brand new development of 238 new homes. A six-minute walk to Slough Train Station, with a commutable time of 16 minutes to London Paddington the development will consist of high-end studios and 1, 2 & 3 bedroom apartments. The construction of the Queen Elizabeth Line (Cross Rail) high-speed connection will further improve connections across London when it is complete in 2022.

The scheme was developed to adopt a full offsite construction and Mid Group were awarded the role of Principal Contractor in 2018.

We are using a Light Gauge Steel Frame for the Superstructure of the building along with a Corium brick slip facade. 


26m

Height

15187M

Square Metres

Activity

Guided tours on site with Mid Group Managers

Visit the sales office

Take part in a Mid Group Online Site Induction

View our Digital Media and BIM models

Witness Mid Group QA processes and procedures

Q&A sessions with the Mid Group Team

On site you will be able to see:

- Light Gauge Steel Frame

- M&E works

- Drylining

- Roofing

- Tower Cranes

- Hoists

- Scaffolding

- Corium Brick Slips 

- Aluminium Windows and Doors

Information on Open Doors 2022 will be released shortly


Information



About Mid Group

The Mid Group is one of the UK's fastest growing construction companies. Founded in 2014, the business has quickly established itself as one of the UK's pre-eminent offsite construction businesses. The Mid Group has won and delivered a number of projects across the South East of the UK, picking up multiple awards along the way.

We work with a range of clients, from the Public Sector, to private developers, helping them realise the maximum value from their investment in a new construction project.


More