Winchester College are looking to replace the current PE centre with modern buildings on a similar footprint, the school will be moving and consolidating parts of the Works Department into a new Support Services building which include a sports centre divided into three connected buildings, including a swimming pool, sports hall, rifle range and fitness suite. Winchester college are also looking for the Design and Technology department to be extended and modernised. The build is very traditional and does have a very attractive design which includes an interesting timber roof over the swimming pool with external zinc cladding. Completion date Summer 2021

site tour 

Address Winchester College
Off Norman Road
Winchester
SO23 9PW
Directions

As Google 

Parking available no
Length of Visit 1 and Half Hours
Maximum Group Size 10
Register by March 17, 2020
School, college, dwp Limited to schools, colleges, educational instituions only
Minimum group size 10 spaces
Maximum group size 10 spaces
Disabled Access no
Child Restrictions no

Sonia Gandhi

Contact form

Book your visit Manage your Bookings

Fully Booked

March 17, 2020

9 a.m. - 10:30 a.m. Fully Booked
3:30 p.m. - 5 p.m. Fully Booked

Want to visit this site but booking not open or fully booked? Use the waiting list function to be notified when places become available

Waiting List