About Spelthorne Leisure Centre
Willmott Dixon are building the new Passivhaus leisure centre for Spelthorne Borough Council, which is due to complete in Spring 2024. It will include a 25 metre eight lane swimming pool, sauna and steam room, sports hall, squash courts, fitness suite, spin studio and football pitches. The building will consist of a steel-CLT hybrid frame and clad in brickwork and structural glazing. The Passivhaus methodology has become the world leading standard in energy efficient design and construction. Consequently, the project has undergone an optimisation process to follow the Passivhaus design principles.
15m
Height
9000M
Square Metres
20%
% Complete
Activity
The day will include a site tour and presentation around the project and what 'Passivhaus' means in the construction industry. You will also have a chance to speak with the team about all of the different roles there are in construction.
Booking
Bookings are currently unavailable for this site.