The new ICEPS facility will provide state of the art research and teaching areas for the engineering and physical science faculties.  Work involves the refurbishment of the Grade II listed Old Mining Building with a 6 storey extension and basement construction to the rear of the building.  Extensive service diversions are required early in the construction programme in order to divert an existing service tunnel that currently dissects the site.

The superstructure consists of a concrete and steel frame with the envelope a mixture of curtain walling and reconstituted stone panels.

Internally the building houses a mixture of high tech laboratory areas and research offices with class 3, 4 and 5 clean rooms in the basement.

Envelope works and internal fit out.

Address BAM ICEPS Project, University of Leeds Site Office, Clarendon Road, Leeds
LS2 9LG
Directions

Our site offices are located within the Old Mining Building.  Pedestrian access is gained from a secure turnstile located in Woodhouse Lane (adjacent to the Chemistry Building).

Download directions to site
Parking available yes

Three is no parking available – Woodhouse Lane is the nearest public car park.

Length of Visit 1 Hour
Maximum Group Size 8
Register by March 13, 2020
School, college, dwp Open to groups and individuals
Minimum group size 1 spaces
Maximum group size 8 spaces
Disabled Access no
Child Restrictions yes

Please note that children need to be over 12 and accompanied by an adult.

Minimum age 12

Beth Kidd

Contact form

Book your visit Manage your Bookings

Fully Booked

March 19, 2020

10 a.m. - 11 a.m. Fully Booked
2 p.m. - 3 p.m. Fully Booked

March 20, 2020

10 a.m. - 11 a.m. Fully Booked
2 p.m. - 3 p.m. Fully Booked

Want to visit this site but booking not open or fully booked? Use the waiting list function to be notified when places become available

Waiting List