Westbury Hotel Extension and Refurbishment. Demolition of parts of the structure, excavation and installation of basement plantroom etc. installation of new steel frame structure to facilitate new rooms, and full refurbishment of existing hotel building, installation of two additional floors.
Interesting Facts -
The hotel is planned to be a St Regis (Marriott) 1ST in UK and will have 197 rooms.
700m3 concrete removed from site during the demolition works.
Just over 2000m3 muck removed during the digging works.
11m dig from road level at basements deepest point.
Activity
Steel frame installation, temporary works installation, front façade installation and windows, and scaffold installation.