The scheme consists of 7  towers sitting on a Podium slab  with an 81 coach park  underneath. The Buildings vary  in height from 12 Apartment  floors for A, B & C to 9  apartment levels for D to F and  24 Apartment levels to Block G.  Within block G there is an  Energy Centre (not part of this  contract) which feeds other developments within the vicinity  of the site. There are 743 Apartments varying from Studio  to 3 Bed. Blocks A-F are  Discounted market rent, and block G, is a PRS. The  external facade is made  predominantly of brick /  glass. The project has CFA / Rotary piles, with an insi-  tu concrete frame. Internally  bathrooms have been podded throughout apart from the  adaptable pods which are  intended to beinsitu.

Site Activities:

 

-          Groundworks

-          Brickwork

-          Scaffolding

-          Window Install

-          External cladding

-          Roofing

-          Mechanical and Electrical Installation

-          Dry Lining

-          Screeding

-          Soft Flooring

-          Kitchen Installation

-          Painting & Decorating

-          Bathroom Pod installation

-          Joinery – 1st Fix and 2nd Fix

 

Address Engineers Way, Wembley
HA9 0EG
Parking available yes

Parking available across the road from the site entrance in Yellow Car Park. Tickets can be validated at the Site Security Office for discount.

Length of Visit 1 Hour
Maximum Group Size 15
Register by March 17, 2019
Disabled Access yes
Child Restrictions yes
Minimum age 16

Mike Higgins

Contact form

The next Open Doors will take place from Monday 16 - Saturday 21 March 2020.

Register your interest