Visit Length

2 hours

Max Group Size

10 People

Booking Status

Closed

About the event

The refurbishment of Thirty High will include a new double height reception on Bressenden Place, a refurbished façade, new windows throughout and a Level 30 rooftop extension. Thirty High is McLaren’s third net zero carbon project after Aldgate Place in London and Firethorn near Leeds and its third major refurbishment in Victoria alone.

The retrofit of Thirty High is a comprehensive refurbishment led by a low carbon delivery goal. More than 60 years after the existing structure had been completed, we are now refurbishing it, retaining its original features whilst reimagining it as a workplace for the future and that’s exactly what we should be doing to reduce carbon emissions from construction. Thirty High is going to demonstrate just how smart, efficient and desirable a retrofitted office can be.”

Located next to Victoria Underground

This site uses CSCS Smart Check – the only platform to verify all 2.1 million CSCS-logoed cards.

Activities

Thirty High has been designed to be net-zero in both construction and operation and will target, NABERS 5*, WELL Core Gold and BREEAM ‘Outstanding’. By retaining the existing building structure, Landsec will achieve a c.60% reduction in embodied carbon compared to the current Greater London Authority benchmark. The building will be fully electric and powered by air source heat pumps, with all energy derived from fully renewable sources.

Information

Educational Visits:
Visits limited to educational institutions only.

Minimum age: 16 years old

Get in touch

Our address:
London, England, SW1E 5RS, United Kingdom

Jessie Stubbs
Jessie.stubbs@mclarengroup.com
+447547119847

Website