Kier Group Plc

Northstowe School

Visit Length

1 hour

Max Group Size

15 People

Booking Status

Closed

About the event

Works in Phase 2 consist of new Secondary School Teaching Block, dedicated Post 16 teaching block adjoining existing Secondary School Building, 3FE Primary School and separate Early Years Buildings including associated external works.
The Secondary School Expansion constituting of a three-storey block containing 21 General Teaching classrooms, replicating the style and format of the Phase 1 science and technology wing, with seven classrooms and a house base suite per floor. The block will be constructed from Cross Laminated Timber.
The Post 16 Centre will be a three storey block constructed from Cross Laminated Timber, and contains a variety of teaching spaces including Science Labs, ICT Suites, an Art Classroom and a Sixth Form Study area. There will be Group Rooms, a General Office and Teaching Staff House bases.
The 3FE Primary School is to be two-storey, with the Early Years being single-storey. Both of these are to be steel framed construction.

Activities

A short presentation, induction and site tour.

Information

Minimum age: 16 years old
16

Accessibility:
Please contact the site to discuss your requirements.

Get in touch

Our address:
69, Stirling Road, Cambridge, England, CB24 1AL, United Kingdom

Rachel Newell
Rachel.newell@kier.co.uk