Bookings open on Monday 8 January 2024.
Events will take place from Monday 18 - Saturday 23 March 2024
Creation of a new enclosed atrium in the Queens’ Building at Queen Mary University of London through the partial demolition of the ground floor structure, alterations to basement level and the erection of a new glazed roof over the existing courtyard. New café and seating facilities will be inserted at basement level. It is also proposed to reconfigure the existing south entrance and internal areas of the foyer and reception so as to provide level access to the building. At the time of the site visit we will be approx 20% complete.
Educational Visits:Visits limited to educational institutions only.
Minimum age: N/A
Accessibility:The building is currently inaccessible to people with mobility issues
Events will take place from Monday 18 - Saturday 23 March 2024