210 place primary school on 2 floors with room for extending to 420 places at a future date. With a fully operational kitchen, offices, classrooms, hall and toilets.

The construction is a flat roof steel frame building. Trench fill foundations with a ground bearing floor slab. Metal deck upper floors and roofs. External walls to be render, timber cladding and glazed tiling. Polyester powder coated windows and doors. Metal stud internal walls. Space heating to be a combination of gas fired and renewable low carbon technology, ventilation and sprinkler system.

Internal fit out including electrics and plumbing, suspended ceilings floor finishes.

Address New Pines Primary School,
Kings Warren Business Park
Red Lodge
IP28 8WG
Site Entrance
Parking available no
Length of Visit 40 Minutes
Maximum Group Size 20
Register by March 19, 2018
Disabled Access yes


Child Restrictions no

Henry Reynolds


Contact form

Book your visit Manage your Bookings

Fully Booked

March 22, 2018

1:30 p.m. - 2:20 p.m. Fully Booked

March 23, 2018

11 a.m. - 11:50 a.m. Fully Booked