Murphy are undertaking works on this contract as Principal Contractor for Orsted (formerly DONG Energy). The scheme is part of the Hornsea One project, a 400 / 220 kV Offshore Windfarm. Our project is to install the Onshore Cabling required to facilitate the windfarm. The site is a linear 'cross country' construction project.

 

 

 

The project consists of a 38km high voltage buried cable installation.  The scope involves site establishment, rights of way management, topsoil strip, haul road construction, trench excavation, cable installation, backfill, jointing support and reinstatement between the landfall and the substation.  There are a number of watercourse crossings and horizontal directional drilling sites required as part of the works. Visitors to the site will see large scale plant operations, excavation techniques, lifting operations and cable installation.

Address Site Compound, A16 Louth Road, Holton Le Clay, DN36 5EE
DN36 5EE
Directions

Leaving Grimsby along the A16 towards Louth, the site compound is located on the left hand side as the A16 passess the village of Holten Le Clay, around 5 miles south of Grimsby.

Parking available yes

The site has a large tarmac dedicated car park immediatly adjacent to the site offices. NOTE: The site operates a reverse parking policy. The site has a manned security gate.

Length of Visit 1 Hour
Maximum Group Size 8
Register by March 19, 2018
Disabled Access no
Child Restrictions no

Lee Carmody

07921872171

Contact form

The next Open Doors will take place in 2019.