Project Description & Keltbray’s Work
Paddington OSD site is situated parallel to the Paddington Basin and sits adjacent to Paddington Station. The current Northern Station Entrance/exit to Paddington sits within the site boundary and will eventually be enveloped once the final scheme is completed. The project comprises a new 21-storey scheme providing approximately 22,155 sqm (15 office floors) of commercial office accommodation and 2 storeys of basement ancillary space. Ground floor to level 4 provides an enhanced reception area along with EOT and shower facilities for tenants. All office floors will have access to private balconies overlooking the canal.
The scheme consists of:
Keltbray have been appointed by Places for London and Helical to act as Principal Contractor to undertake the following works associated with the Paddington OSD Project:
Keltbray started works on site in June 2025 and are currently working on the main scope items due to be completed in February 2027. This will be followed on by the planned return works including the demolition of the existing taxi ramp structure in the summer of 2028. The appointed main contractor will then continue with the scheme to project completion.
Current and Future Works
At Paddington OSD, Keltbray are currently undertaking works which include the ongoing site activities:
Future Site Activities within our Package (Completion: February 2027):
Visitors will be able to see and observe the ongoing construction works and get an understanding of how Keltbray work and operate as a Principal Contractor, delivering the Paddington OSD Project, on behalf of our client.
Once the visitors arrive to site office, they will be met by the management team who will sort out all PPE for each delegate. After this, we will go into the meeting room for site introduction and review of the project details ahead of a full site tour. Key construction activities will include the following:
Our team will outline how they came to work within the construction industry and advise on their experiences to date. A representative from the project team will be on hand to explain the project deliverables and answer any questions you may have throughout your visit.
Educational Visits:Visits limited to educational institutions only.
Minimum age: 16 years old
Health & Safety Regulations due to live project site
Accessibility:Nearest Station is Paddington Station (Elizabeth Line, Bakerloo Line, Circle Line, Hammersmith & City Line, GWR). Our Paddington OSD Project site is located 5 minutes walk away from the station. The Project Office Entrance for Visitors is located underneath Bishop’s Bridge, along the canal. A separate PDF for arriving via train/car can be requested.
Our address:
Sheldon Square, London, England, W2 6DS, United Kingdom
Helen Trinh
helen.trinh@keltbray.com