To support local growth and safeguard river health, we are increasing the treatment capacity at Earlswood STW. Aligned with the 2031 design horizon, these works ensure long-term permit compliance and prevent pollution by managing higher Flow to Full Treatment volumes.
Approximate duration of the project is 200 weeks, due to complete in December 2027.
This site uses CSCS Smart Check – the only platform to verify all 2.3 million CSCS-logoed cards.
Site visitors will attend a presentation delivered by project team members, highlighting current operations alongside available career pathways and opportunities. The session is scheduled to last between one and two hours
Educational Visits:Visits limited to educational institutions only.
Minimum age: 16 years old
Anyone under the ages of 16 need to be accompanied by an adult
Accessibility:Please report to the security gate upon arrival; the gateman will manage your site entry and access requirements. A large car park is available adjacent the site PPE is not required for this visit; however, please ensure you wear sturdy, closed-toe footwear
Our address:
Woodhatch Road, Reigate, England, RH2 7QH, United Kingdom