A 2FE expansion project that will facilitate the school in accommodating an extra 240 students aged between 13 and 18 from 1200 total no. of students to 1440 total no. of students.

 

In order to provide sufficient teaching space required for the additional two forms of entry, a mixture of refurbishment and new build works need to be carried out. A new build block will house the much-needed upgraded science facilities and sixth form department, as well as providing additional general teaching space. Refurbishment of the existing sixth form centre, science department, kitchen, IT and DT areas will create the further required teaching spaces needed for the additional 240 students. 

 

The scope of works will also include the removal of the 3nos. temporary maths huts, which will be made redundant once the new build works and refurbishment works are complete. The maths huts are currently in poor condition and beyond their expected lifespan.  A four court netball pitch is to be provided along with additional car-parking spaces and site-wide soft landscaping works.

- Completion of the external netball courts

- Groundworks to accomodate modular building units

- BIM overview

- Offsite construction principles

- VR Headset demonstrations

Address Vandyke Upper School
Vandyke Road
Leighton Buzzard
LU7 3DY
Directions

See attached delivery access plan

Download directions to site
Parking available yes

Limited site parking available via Gate B

Length of Visit 1 Hour
Maximum Group Size 20
Register by March 15, 2020
School, college, dwp Open to groups and individuals
Minimum group size 1 spaces
Maximum group size 20 spaces
Disabled Access no
Child Restrictions no

James Wood

Contact form

Book your visit Manage your Bookings

March 18, 2020

9 a.m. - 3 p.m. 8 Places Left Book

Want to visit this site but booking not open or fully booked? Use the waiting list function to be notified when places become available

Waiting List