Tilbury Douglas

Catterick Integrated Care Campus

Visit Length

60 Minutes

Max Group Size

10 People

Booking Status

Closed

About the event

A joint venture between the NHS and MOD, the integrated care campus will create a new first-class health and care facility for local people and the military population of Richmondshire.

The new Integrated Care Campus is being built at Catterick Garrison, next to Baden Powell House.

The new three storey building will be the first of its kind, offering a transformational building, bringing together local GP services, MOD medical service provision, community services, mental health care and voluntary, community and social enterprise sector services.

The building itself is designed to meet the requirements of an operational net zero carbon facility, with minimisation of energy consumption embedded in the design of the building and systems. There is also a client requirement to achieve a DREAM (Defence Related Environmental Assessment Methodology) Excellent rating.

The project will be still in the groundworks stage with completion not planned until Spring 2026.

Activities

Visitors will be welcomed into the site office where the site team will present a presentation about the project. There will be the opportunity for people to see the construction site, however due to the stage in the project there will be no walk onto the site.

Visitors are welcome on Thursday 21st March 2024

Session 1 1:00 pm – 2:00pm

Session 2 2:30 pm – 3:30 pm

Information

Minimum age: 12 years old

Accessibility:
Unfortunately this site does not have disabled access

Get in touch

Our address:
Scotton Road, Catterick Garrison, England, DL9 3JS, United Kingdom

Lucy Bansal
Lucy.bansal@tilburydouglas.co.uk
07832 905302