  • The biggest delivery of new affordable homes in South Westminster in over 50 years
  • The creation around 780 homes, including 370 council homes for social rent, 21 intermediate ownership homes and 389 homes for sale/rent
  • A recent resident ballot saw 91% of voters support the council’s plans for the scheme and opens the door for partnership working with the Greater London Authority
  • The project is seeing the full redevelopment of the existing 1930s estate and the creation of new high-quality, sustainable homes.
  • Utilising ground source heat pumps the new neighbourhood will use 90% less carbon than the current homes
  • It will aim to be an almost car-free development, with disabled car parking only. Both pedestrian and cycle transport will be a top priority with more than 2,000 cycle spaces for residents.
  • The newly built homes will use 90 per cent less carbon than the existing estate and grey water recycling will be used for household functions, in line with Westminster City Council’s plans to be carbon net zero by 2040.
  • As well as 780 homes, there will be a new community hub, nursery and fitness centre for residents and visitors. Plus, there will be four high-quality public squares created with water and play features.
  • The green spaces will have enhanced lighting for security and an on-site management team.
  • Around 270 new trees will be planted, as well as the retention of mature existing trees. Alongside this, there will be new flowerbeds and plants, forging natural havens for the local community and increasing biodiversity.
  • An extended high street with new local shops and cafés has also been approved and there will be new places to work including flexible workspace on Ebury Bridge Road and at the new northern gateway.

 

This site uses CSCS Smart Check – the only platform to verify all 2.1 million CSCS-logoed cards.

Activities

The site will open its door for the ‘Open Doors National Site Visit; on Tuesday, March 19th 2024 only.

We will have 2 slots time with a group of 14 people max.

  • 1st slot from 10.30 am to 11.30am
  • 2nd slot from 2.30pm to 3.30pm.

What is going to happen on the visit?

We will have a 30 min of Project Presentation at our site office and after that we will have a site tour. For the site tour, PPEs is mandatory as well following the site manager’s instructions.

*This is a good opportunity to local residents and general public to learn more about the project and see a live construction site on its full operation.

 

Information

Educational Visits:
Visits limited to educational institutions only.

Minimum age: 17 years old
17

Accessibility:
Site is not able to accommodate people with physical disabilities

Get in touch

Our address:
Ebury Bridge Road, London, England, SW1W, United Kingdom

Paula Arkwell-Waller
paula.arkell-waller@bouygues-uk.com

Kathryn Ridyard
kathryn.ridyard@bouygues-uk.com