Tarmac and Kier Joint Venture (TKJV) were appointed by Transport for London to Transform the northern and southern roundabouts at Lambeth Bridge.

The scheme will improve safety on the bridge and at both the northern and southern junctions. Replacing the roundabouts with signal-controlled junctions means TfL can:
• Add new, safer signal-controlled pedestrian crossings, replacing zebra crossings on the Westminster side of the bridge
• Protect and provide time for cyclists to safely connect to existing cycle routes, such as Cycleway 8 on Milbank

Activities

This event is now fully booked

Educational Visits:
Visits limited to educational institutions only.

Date: 18th March 2025
Time: 13:00-16:00

Information

Educational Visits:
Visits limited to educational institutions only.

Minimum age: N/A

Unfortunately all sessions at this location are FULLY BOOKED for 17/03/2025 - 22/03/2025.

Please try another local site.

Get in touch

Our address:
London, England, SE1 7TY, United Kingdom


sustainability@kier.co.uk