Bookings open on Monday 8 January 2024.
Events will take place from Monday 18 - Saturday 23 March 2024
Kier has been appointed by Network Rail to deliver the main works package at Oxford railway station. This includes the replacement of the existing railway bridge with a new, wider structure which will incorporate 4-metre-wide cycle/footways on either side of the road. Highway lowering and realignment will provide additional height clearance resulting in double-decker buses being able to pass underneath the bridge for the first time. This will also see the replacement of the existing footbridge.
We will also deliver station improvement works which will involve the construction of an additional platform and overhead canopy, a new western station entrance, ticket office, waiting room, toilets, café and shops, alongside the construction of a subway to connect the western entrance to the new platform.
The package includes the demolition of buildings surrounding the station, and road alignment works at Roger Dudman Way, including the replacement of Sheepwash Bridge, to improve safety at the junction with Botley Road.
Once complete, the new fifth platform and enhanced facilities will significantly improve the capacity of the station, accessibility, safety and passenger experience.
Demolition works.
Utility diversion enabling works
Platform 4/5 enabling works (Potentially)
Educational Visits:Visits limited to educational institutions only.
Minimum age: N/A
Accessibility:Please contact this site to discuss your requirements.
Events will take place from Monday 18 - Saturday 23 March 2024