Willmott Dixon

Oxlow Bridge School

Visit Length

1 hour

Max Group Size

6 People

Booking Status

Closed

About the event

You will be shown around the construction site of The Oxlow Bridge School.

Once finished, it will be a brand new, 100 place school, covering 3,700mof floor space and specially designed to support the PMLD needs of pupils from four to 19 years old.

Some key features the new school will include:

  • Drop off and collection points, designed to make the process smoother.
  • 16 large general classrooms, each on benefitting from direct access to an individual external covered teaching area, as well as access to additional outdoor areas for play, learning and sensory exploration.
  • Ceiling mounted tracked hoists will provide connection between classrooms and adjacent Hygiene Rooms.
  • A Hydrotherapy Pool, Life Skills, Art / Music and Sensory & Therapy rooms which will all benefit from having a ceiling mounted tracked hoist.
  • A mixture of specialist Sensory and Therapy rooms centrally located for ease of use by all
  • A multi-use Hall which will have a trampoline built into the floor to assist pupils with therapy.
  • Large rooflights to provide natural light to corridors and open areas of shared storage areas will help to make circulation spaces feel more comfortable.
  • Community access will be provided to the hydrotherapy pool outside of school operating hours.

Activities

You will be greeted on site by a member of our team and given a quick presentation and safety briefing before being given PPE. You will then be given a 30minute tour around our construction site to see the different aspects of construction happening in real time.

Information

Minimum age: N/A

Get in touch

Our address:
100, Wantz Road, Dagenham, England, RM10 8PP, United Kingdom

Alice Turner
Alice.turner@willmottdixon.co.uk