John Sisk & Son

Great Ormond Street Hospital Children’s Cancer Centre – Public Event

Visit Length

2 hours

Max Group Size

12 People

Booking Status

Fully Booked

About the event

We are the principal contractor for The Great Ormond Street Hospital Children’s Cancer Centre on Great Ormond Street London.

The project began in December 2023 with the Advance Works. These works involved separating all existing utilities from the Frontage Building with the rest of the hospital to ensure that the rest of the hospital continued to fully function throughout.

The project itself is due to complete in October 2028.

In February 2025 we completed the Advance Works and began work on the Main Works.
To date we have deconstructed the existing Frontage Building, and breaking out the concrete slab, along with piling in preparation for starting the main build in summer 2026.

The previous Frontage Building was 1 basement and 6 floors; the new Children’s Cancer Centre will be 2 basements and 8 floors. The new building will offer a new school, a cancer day care service, cancer inpatient wards, critical care, imaging and theatre facilities, special feeds unit, a new school and a roof terrace which will be accessible to all the patients.

This site uses CSCS Smart Check – the only platform to verify all 2.1 million CSCS-logoed cards.

Activities

Monday 23rd – Engineering (educational groups only)

Tuesday 24th – Site Management (educational groups only)

Wednesday 25th open to the local community

Thursday 26th – Mechanical and Engineering (educational groups only)

We look forward to meeting you.

Information

Minimum age: 16 years old
This event is for the community and would not suit small children or babies.

Accessibility:
There is a lift available.

Unfortunately all sessions at this location are FULLY BOOKED for 23/03/2026 - 28/03/2026.

Please try another local site.

Get in touch

Our address:
Guilford Street, London, England, WC1N 3BH, United Kingdom

Patsy Evans
patsyevans@sisk.co.uk
07760571107

Website