Tilbury Douglas

St Anne’s Bridge

Visit Length

60 Minutes

Max Group Size

11 People

Booking Status

Closed

About the event

The project involves replacing St Anne’s Road bridge, which goes over the M67 motorway. The existing bridge required extensive structural repairs due to its age and its outdated style of construction

Activities

Visitors will be welcomed into the site office where the site team will present a presentation about the project which will them followed by a site tour of the construction site.

We will be offering visits on the 19th March and times available are;

Session 1, 10.00-11.00

Session 2, 11.00-12.00

Session 3, 12.30-1.30

Session 4, 1.30-2.30

Session 5, 2.30-3.30

Information

Minimum age: 12 years old

Get in touch

Our address:
Manchester, England, M34 3DY, United Kingdom

Clair Wakefield
clair.wakefield@tilburydouglas.co.uk
07974 878681